Laserfiche WebLink
RULE 2 PERMITS <br />In early 1977, Colowyo contracted with Golder Associates to perform a stability study on Streeter Fill to <br />expand on previous engineering studies. The results of their work, Waste Dump Stability Study (April, <br />1977), found in Exhibit 12, Experimental Practice Information, demonstrated that the planned <br />construction techniques of Colowyo would ensure stability. <br />In December, 1978, Ms. Carolyn Johnson and Mr. Charles Callison of the Public Lands Institute, Inc., <br />submitted a Citizen's Complaint to the Office of Surface Mining. Two of the complaints alleged that <br />Colowyo was not constructing the Streeter Fill in compliance with OSM Interim Regulations. <br />As a result of a request from the Public Lands Institute, Inc., a joint inspection of the mine (and Streeter <br />Fill) was conducted by OSM and the Division. A notice of violation was issued to Colowyo regarding the <br />construction of terraces on the face of the fill. <br />Colowyo applied to the office of Hearings and Appeals for review of the Notice of Violation issued <br />regarding the construction of Streeter Fill. <br />Prior to the first scheduled evidentiary hearing, Colowyo and OSM agreed to postpone the hearing until <br />the completion of an independent engineering study of the stability of the Streeter Fill. OSM contracted <br />with CTL/Thompson, Inc. to conduct a geotechnical analysis of the fill. The report by CTL/Thompson, <br />Inc., Slope Stability Colowyo Streeter, Canyon Fill (August, 1979) along with miscellaneous OSM <br />correspondence is found in Exhibit 12, Experimental Practice Information. <br />The geotechnical analysis completed by CTL/Thompson, Inc., concluded that the Streeter Fill, as built by <br />Colowyo meets the stability requirements of OSM regulations. <br />The fill did not, however, meet the design criteria: requirement of the OSM Interim Regulations and <br />therefore was still in violation. To resolve the issue, OSM agreed to withdraw the Notice of Violation <br />conditioned upon the agreement that Colowyo submit an application for qualifying the Streeter Fill under <br />the Experimental Practices Program referred to in 30CFR, Section 785.13; see Hearing for Review of <br />Notice of Violation No. 79-V-1-4, August 7, 1979 in Exhibit 12, Experimental Practice Information. <br />Subsequent to the hearing, Colowyo filed an application for an experimental practice on September 4, <br />1979, (see Exhibit 12, Experimental Practice Information) and receipt of the application was <br />acknowledged in a letter from Walter N. Heine, Director of OSM, on September 28, 1979 (see Exhibit 12, <br />Experimental Practice Information). <br />To date, there have been no final approvals or denials of the Experimental Application by OSM or the <br />Division. <br />In correspondence dated October 11, 1979, OSM requested the Division recommend approval of the <br />experimental practice designation for Colowyo's Streeter Fill. In a letter dated February 13, 1980 the <br />Division replied to OSM that approval of the experimental practice could not be given until certain <br />questions were resolved. A copy of the correspondence from the Division, the February 6, 1980 letter <br />from Mr. Jim Pendleton commenting on the Slope Stability Analysis of Colowyo's Streeter Fill, and the <br />February 13, 1980 letter from Mr. Fred Banta to Mr. Donald Crane requesting Clarification Before <br />Approval of Colowyo's Streeter Fill is included in Exhibit 12, Experimental Practice Information. On <br />March 24, 1980, CTL/Thompson, Inc. responded to the concerns of the Division (see Exhibit 12, <br />Experimental Practice Information, March 24, 1980, letter from CTL/Thompson, Inc. to OSM <br />commenting on Questions Raised by Division Concerning Colowyo's Streeter Fill). <br />Rule 2 Permits 2.06-3 Revision Date: 6/23/08 <br />Revision No.: MR-91