My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-29_PERMIT FILE - C1981019A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019A
>
2008-09-29_PERMIT FILE - C1981019A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:41 PM
Creation date
12/2/2008 4:13:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
9/29/2008
Section_Exhibit Name
2.05 Operations and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PERMITS <br />Main Office <br />The main office for the Colowyo operation is located in Section 23, Township 4 North, Range 93 West. <br />The office building was constructed in 1977 and contains approximately 9,000 square feet. The office <br />houses Colowyo's administration, engineering, environmental, accounting, and payroll departments. <br />Refer to Exhibit 13 Appendix D (pages D-18 through D-22). <br />Records Retention/Trainin2 Center/Visitor Center <br />This building is located in 523, T4N, R93W and historically served as the main administration building. <br />The building was constructed in 1977 and has a footprint of approximately 9,000 square feet. The <br />building serves as a location for long term records retention, training center, and visitor center. Refer to <br />Exhibit 13 Appendix D (pages D 18 through D22). <br />Shops, Warehouse Facility, Change/Production Facility <br />Colowyo maintains several shops, a warehouse facility, and change production building at the operation <br />covering approximately 30 acres in 534, T4N, R93W. <br />Mechanical repair work on the mobile mining equipment fleet is performed at the shop facility and in the <br />field. A welding facility and tire bay is also a part of the shop facility. The warehouse contains an <br />inventory of equipment parts for use in the comprehensive maintenance program. The warehouse yard <br />also provides storage of the larger parts due to limited covered building space. Employees use the change <br />facility/production building in this location before and after their shift to change either into their work <br />clothes or back into their street clothing. Shower facilities are provided in the change complex. Additional <br />structures in the complex include a diesel fueling and gasoline fueling station for both the large mobile <br />mine equipment and the mine pickup truck fleet, a tank farm building and numerous above ground <br />storage tanks.. Mobile equipment and employee parking areas are also provided at the complex. Several <br />coal stockpile areas as shown on Map 22A are found near the shop facility to provide for temporary <br />storage of the coal. A reclamation storage building, sign storage building, potable water treatment plant, <br />powder magazines, and a temporary hazardous waste storage facility are also located in this area. Refer <br />to Exhibit 13 Appendix D (pages D-18 through D22). <br />Drainage from the shop and warehouse complex is collected as shown on the Map 12 and 12A This <br />structure has been designed as shown under the Ponds, Impoundments and Diversions Section of 2.05.3. <br />Laboratory, Production Office Personnel Offices and Chancre Room Facility <br />Colowyo maintains a multi-purpose facility covering approximately 2 acres in Section 34, Township 4 <br />North, Range 93 West. This facility contains two structures as shown on the Existing Structures - South <br />Map (Map 22). <br />Coal analysis is performed in the- laboratory portion of the larger structure. Production crews have locker, <br />shower, and toilet -facilities provided in part of the larger structure. The remainder of the larger structure <br />is used for training, safety, crew assembly, and production management offices. The smaller structure <br />contains offices for the Human Resources Department. Included in this area is a paved parking lot used <br />for all production and maintenance personnel based in the area and some company owned small vehicles. <br />Drainage from this area is collected as shown on Map 12 - Hydrology - South Map and Map 12A <br />Gossard and Mine Maintenance Areas. <br />Rule 2 Permits 2.05-6 Revision Date: 6/23/08 <br />Revision No.: MR-91
The URL can be used to link to this page
Your browser does not support the video tag.