Laserfiche WebLink
&MIT D, C.F. and R.M. Cooper Trust #7 <br />RECEIVED <br />Mining Plan SEP 11 2M <br />Diritiaa of Miqudb mid %01W <br />a) the material will be moved by front-end loaders and trucks, a bull dozer will be used in <br />location where loader is impractical due to loose footing <br />b) the topsoil and subsoil will be removed by front-end loader and bulldozer and separately <br />stockpiled for use in reclamation <br />c) there will be no water diversions and impoundment's necessary at this pit, all <br />dikes and berms will be for safety and erosion control <br />d) the area to be disturbed at any one time should not exceed 10 acres <br />e) mining will start with this permit and continue sporadically during the years as required, <br />reclamation will be on going as the site is mined, the active area in the Southwest corner <br />will be continued until exhausted, active mining will move to Northwest and East. <br />Reclamation will begin we'll pull 6" of topsoil from stockpile in at pit site. Reclamation <br />will proceed as mining moves Northwest and East with topsoil stored on-site to be planted <br />with native grasses with ground sloped 3;1 where necessary <br />f) (i) material to be mined is gravel and sand of varying depth with none to 3 R of topsoil <br />overburden <br />(ii) straight below material is rock and will not be disturbed <br />g) the primary commodity will be gravel for use as road surfacing and the secondary <br />commodity will be clay for use as road bed materials <br />h) there will be no refuse, acid or toxic producing materials exposed during <br />mining <br />6