My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-20_REVISION - M1978225L
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978225
>
2007-12-20_REVISION - M1978225L
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:59 PM
Creation date
12/2/2008 2:07:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978225L
IBM Index Class Name
REVISION
Doc Date
12/20/2007
Doc Name
TR to increase limit of disturbed acreage
From
DRMS
To
Baca County Commissioners
Email Name
DEG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*EXHIBIT D, Nyle McVey Pit #16 40 <br />Mining Plan ,, <br />OIININIIINNFI <br />999 <br />a) the material will be moved by front-cnd loaders and trucks, a bull dozer will be used in <br />location where loader is impractical due to loose footing <br />b) the overburden will be moved by front-end loader and bulldozer and stockpiled <br />for use in reclamation <br />c) there will be no water diversions and impoundment's necessary at this pit, all <br />dikes and berms will be for safety and erosion control <br />d) the area to be disturbed at any one time should not exceed 10 acres <br />e) mining will start with this permit and continue sporadically during the years as required, <br />reclamation will be on going as the site is mined, the active area in the Southwest comer <br />will be continued until exhausted, active mining will move to the North and to the East <br />reclamation will begin will pull 6" of topsoil from stockpile at pit site. Reclamation will <br />proceed as mining moves to the North and to the East with topsoil stored on-site to be <br />planted with native grasses with ground sloped 3:1 where necessary <br />0 (i) material to be mined is gravel and sand of varying depth with none to 3 ft of topsoil <br />overburden <br />(ii) straight below material is rock and will not be disturbed <br />g) the primary commodity will be gravel for use as road 'surfacing and the secondary <br />commodity %%ill be clay for use as road bed materials <br />h) there will be no refuse, acid or toxic producing materials exposed during <br />mining
The URL can be used to link to this page
Your browser does not support the video tag.