My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-02_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2008-12-02_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:28 PM
Creation date
12/2/2008 1:42:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
12/2/2008
Doc Name
Proposed Decision & Findings of Compliance for SL9
From
Phase II
Permit Index Doc Type
Findings
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
operator. <br />Submittal of Bond Release Application and Completeness Determination by the <br />Division <br />The Division received TMI's bond release application SL-09 on October 3, 2008. The <br />application was found complete on October 6, 2008, after the Division received proof of <br />publication of the applicant's public notice. The completeness determination was made in <br />accordance with Section 3.03.2(1)(d). <br />TMI submitted the bond release application following the procedures described in the Act <br />and Regulations. The application also utilized the Division's Guideline Regarding Selected <br />Coal Mine Bond Release Issues, dated April 18, 1995. <br />Public Notice <br />TMI published notice of the bond release application in the Craig Daily Press once weekly <br />for four consecutive weeks, beginning on August 22, 2008. TMI also notified landowners <br />within and adjacent to the mine permit area, and other interested parties of the application for <br />bond release, as required by section 3.03.2(1). The Division received no written comments, <br />objections, or requests for an informal conference regarding the bond release application. <br />Bond Release Inspection <br />The Division scheduled and conducted a bond release inspection on October 13, 2008 <br />through October 16, 2008. The site inspection was conducted in accordance with Section <br />3.03.2(2). Jason Musick and Daniel Hernandez represented the Colorado Division of <br />Reclamation, Mining, and Safety. The operator was represented by Graham Roberts and <br />Forrest Luke of Trapper Mining, Inc. Christine Belka and Jennifer Maiolo represented the <br />US Office of Surface Mining and the US Bureau of Land Management respectively. It was <br />determined during this initial inspection that some gully and drainage maintenance was <br />needed. <br />The Division conducted a second inspection on November 12, 2008 to ensure maintenance <br />items noted during the October 13?h inspection had been adequately addressed. Jason Musick <br />represented the Division, Christine Belka represented the Office of Surface Mining and <br />Graham Roberts represented the operator during the inspection. <br />III. CRITERIA FOR BOND RELEASE <br />Phase I Bond Release <br />Rule 3.03.1(2)(a) states, "Up to sixty percent of the applicable bond amount shall be released <br />when the permittee successfully completes backfilling, regrading, and drainage control in <br />Trapper Mine Page 5 December 2, 2008 <br />Phase III Bond Release
The URL can be used to link to this page
Your browser does not support the video tag.