Laserfiche WebLink
• <br />SEDCAD 4 for Windows <br />(:nnvrinM ~ QOA Pomnh .I Gh.enh <br />Subwatershed Hydro%gy Detai/; <br /> r <br />Time of _ <br />~ Peak ~ ~ <br />~ Runoff. _~ <br />Stru SWS SWS Area Musk K Curve <br />Conc Musk X UHS <br />Discharge . <br />Volume <br /># # (ac) (hrs) Number <br />am <br /> (h <br />) cfs <br />.( ) ac-ft <br />( ) <br />#1 1 0.460 0.037 0.000 0.000 87.000 M 0.45 0.035 <br /> 0.460 0.45 0.035 <br />Subwatershed Sedimento%gy Detai/; <br /> Peak Peak <br />Stru SWS Sediment Sediment Settleable 24VW <br />Soil K L (ft) S (%) <br /># # C P PS # Cone. Conc <br /> (tons) (ml/I) <br /> <br />#1 1 0.370 100.00 10.00 0.2600 1.0000 1 1.2 49,883 14.59 8.42 <br /> 1.2 49,883 14.59 8.42 <br />Subwatershed Time of Concentration Detai/S; <br />C7 <br />LJ <br />Strt1 SWS <br />Land Flow Condition Vert. Dist. <br />Slope <br />(%) Horiz. Dist: Velocity' <br />Time (hrs) <br /># # , <br />(ft) (ft) (fps) <br />#1 1 5. Nearly bare and untitled, and 4.20 10.00 238.00 2.040 0.032 <br /> alluvial valley fans <br /> 7. Paved area and small upland 22.22 40.00 180.00 9.480 0.005 <br /> gullies <br />#i i Time of Concentration: 0.037 <br />7 <br />Filename: TSPiie-TopSiItSAE.sc4 Printed OS-1 ~1-2002 <br />