Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name: DRMS <br />03a State :Colorado <br />1112412008 <br />THM <br />County :Garfield <br />Site :Dick Casey Concrete Pit <br />Permit/job #:M-1977-349 <br />Abbreviation :none <br />Filename :M349-03a <br />Permit or other job action :Final Reclamation Cost Update <br />Task description :Spread 6" of topsoil over Phases 1 & 2 <br />xi, <br />116, <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />ipment Description <br />Scraper work team -Scraper <br />-Push dozer <br />633E Series 2 (2001 <br />Support equipment -Load area <br />-Dump area <br />Cost Bre <br />Road maintenance -Motor grader <br />-Water truck <br />akdown : Scraper Work Team <br />Scraper Dozer Support Eq <br />Load area uipment <br />Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : <br />% Utilization-machine : scraper2 <br />100 NA <br />NA misctruk <br />10 dozer <br />20 NA <br />NA NA <br />NA <br />-Ripper attachment : <br />Ownerhip cost/hour : NA <br />$80.67 NA <br />NA NA <br />$7.53 NA <br />$50.32 NA <br />NA NA <br />NA <br />Operating cost/hour : $117.98 NA $1.55 $15.43 NA NA <br />cost/hour : <br />Ripper op NA NA NA $0.00 NA NA <br />. <br />Operator cost/hour : <br />Unit subtotals : $24.95 <br />$223.59 NA <br />NA $21.99 <br />$31.07 $32.78 <br />$98.52 NA <br />NA NA <br />NA <br />Number of units : 2 0 1 1 0 0 <br />Group subtotals : Work : $447.18 Support: $129.59 Maintenance : $0.00 <br />Total work team cost/hour : $576.77 <br />MATERIAL QUANTITIES <br />Swell Loose <br />Initial <br />volume : 15,326 LCY factor : NA volume <br />Source of quantity take-off :Reclamation Map Exhibet F <br />Source of estimated swell factor :NA <br />Tanker, 2,500 Gal. <br />68R Series ll - 8SU (2005) <br />15,326 LCY