Laserfiche WebLink
ADJUSTED COSTS <br />Ownership Costs <br /> <br /> <br />l <br />Overha <br />Overhaul and Oper <br /> <br />Field Repair <br />ating Costs <br />;sheet f 2 <br /> Depreciation CFC Overhead Labor Parts Labor Parts <br />NA NA Fuel Lube Tires <br />NA NA NA <br />Acquisition cost : <br />Econ.life -Dozer and ROPS : <br />-Att achment no. 2 : <br />Annual usage : <br />Double shifts : <br />Triple shifts : <br />Mechanic labor-Dozer and ROPS : <br />-Attachment no. 2 : <br />Fuel/lube -Dozer and ROPS : <br />Attachment no. 2 : $15.43 <br />$15.43 <br />NA <br />$23.28 <br />$17.46 <br />$15.53 <br />NA <br />NA <br />NA <br />NA NA <br />NA <br />NA <br />$11.13 <br />$5.57 <br />$3.71 <br />NA <br />NA <br />NA <br />NA NA <br />NA <br />NA <br />$15.90 <br />$7.95 <br />$5.29 <br />NA <br />NA <br />NA <br />NA NA <br />$7.24 <br />$0.00 <br />NA <br />NA <br />NA <br />$5.65 <br />$0.00 <br />NA <br />NA NA <br />$13.57 <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA $8.05 <br />$0.00 <br />NA <br />NA <br />NA <br />$6.28 <br />$0.00 <br />NA <br />NA $13.09 <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$30.56 <br />$0.00 NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$5.97 <br />$0.00 NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$2.01 <br />$0.00 <br /> <br /> <br />ADJUSTED COST SUBTOTALS <br />Ownership Costs Overhaul and Operating Costs <br /> <br />Overhaul Field Repair <br /> reciation CFC Overhead <br />De Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br /> p <br />Dozer, ROPS and Attachment no. 2 : <br />hifts : <br />l <br />Si <br />28 <br />$23 <br />$11.13 <br />$15.90 Dozer and ROPS : <br />$5.65 $13.57 $6.28 $13.09 $30.56 $5.97 $0.00 $2.01 <br />e s <br />ng . <br />Double shifts <br />Triple shifts : $17.46 <br />: $15.53 $5.57 <br />$3.71 $7.95 <br />$5.29 ttachment no. 2 <br />$0 00 $0:00 $0.00 $0.00 $0 00 $0.00 $0.00 $0.00 <br />GES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br />HOURLY OPERATOR WA Rate Benefits 7.65% 6.20% <br />$1 <br />28 9.80% <br />$2 <br />03 ($/hr) <br />78 <br />$32 Shift Differential <br />Day : $0.00 Colorado labor zone :I <br />Two shift per day average : 2 <br />$0.15 <br />Dozer operator (< 70hp) <br />Dozer operator (>=70hp) <br />Mechani $20.67 <br />$20.67 <br />$20.97 $7.22 <br />$7.22 <br />$7.22 $1.58 <br />$1.58 <br />$1.60 . <br />$1.28 <br />$1.30 . <br />$2.03 <br />$2.06 . <br />$32.78 <br />$3315 Swing : <br />Night: $0.30 <br />$0.45 Three shift per day average :1 . $0.25 <br />HOURLY EQUIPMENT COST SUMMARY <br />Ownership Operating and Overhaul Operator <br />7 Machine I Attachments <br />Single shifts : $50.32 $77.13 $0.00 $32.78 <br />Double shifts : $30.98 $77.13 $0.00 $32.93 <br />Triple shifts : $24.53 $77.13 $0.00 $33.03 <br />Total <br />($) <br />Cost/hr <br />$160.22 <br />$141.03 <br />$134.69 <br /> <br />EQUIPMENT PERFORMANCE DATA <br /> <br />Description . <br />Horsepower <br />(FHP) <br />Transmission <br />Type <br />Weight <br />(UST) <br />41 <br />8 <br />Length <br />(ft) <br />7 <br />22 <br />Width <br />(ft) <br />7 <br />8 <br />Height <br />(ft) <br />11.5 <br />Fuel <br />type <br />diesel <br />Ripper <br />type <br />NA <br />Dozer : <br />Blade: <br />Attachment no. 1 : <br />Attachment no. 2: Cat D8R Series 11- 8SU (2 <br />Semi-Universal <br />BOPS Cab <br />NA 310 <br />NA <br />NA <br />NA NA <br />NA <br />NA <br />NA <br />Total weig6 ht . <br />5.4 <br />NA <br />NA <br />47.2 . <br />NA <br />NA <br />NA <br />(UST) . <br />12.9 <br />NA <br />NA 5.5 <br />NA <br /> <br />NA NA <br />NA <br /> <br />NA NA <br />NA <br />NA <br />-X X