Laserfiche WebLink
CIRCES Cost Estimating Software <br />IPMENT MOBILIZATION / DEMOBILIZATIO <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task # : 06a State : Colorado <br />Date : 11/25/2008 County :Garfield <br />User : THM Site :Dick Casey Concrete Pit <br />sheet 1 of 2 <br />Permit or other job action :Final Reclamation Cost Update <br />Task description : Secondary seeding mobilization <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tra ctor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> capacifiess pacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown st/h our : $16.63 $18.37 $22.33 <br /> = <br />st/hour : $44.38 $46.13 $50.07 <br /> st/hour : $27.66 $27.66 <br /> st/hour : $0.00 $25.39 <br /> ost/hour : $88.67 $117.55 $125.45 <br />NUM-RVNUAOL-r- L-aKUIU IVI- <br />Machine <br />Description <br />-Revegetation Tractor - <br />Weightlunit <br />(Tons) <br />20.00 <br />Ownership <br />Cost/hr/unit <br />$20.00 <br />Haul Rig <br />Cost/hr/unit <br />$88.67 <br />Fleet Size <br />(No. units) <br />1 <br />Haul Trip <br />Cost/hr/fleet <br />$108.67 <br />Return Trip <br />Cost/hr/fleet <br />$88.67 <br />DOT permit <br />Cost/fleet <br />$250.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $108.67 $88.67 $250.00 <br />Permit/job #:M-1978-346 <br />Abbreviation :none <br />Filename :M346-06a