Laserfiche WebLink
CIRCES Cost Estimating Software <br />%AFNT MOBILIZATION / DEMOBILI2 <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task #: 05a State :Colorado Permit/job #:M-1978-349 <br />Date : 1112512008 County :Garfield Abbreviation :none <br />User : THM Site :Dick Casey Concrete Pit Filename :M349-05a <br />Permit or other job action :Final Reclamation Cost Update <br />Task description :Initial mobilization to and from site <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />ccapacittiess pacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown st/h our : $16.63 $18.37 $22.33 <br />= <br />st/hour : $44.38 $50.07 <br />st/hour : $27.66 $2766 $27.66 <br />st/hour : $0.00 $25.39 <br />ost/hour : $88.67 $117.55 $125.45 <br />ryVry-RVAUMGLC Gylyor m? <br />Machine <br />Description <br />-Cat D8R Seies 8SU (20 <br />-Cat 633E Series 2 (2001) <br />-Revegetation Tractor . <br />Weight/unit <br />(Tons) <br />52.55 <br />56.34 <br />20.00 <br />Ownership <br />Cost/hr/unit <br />$50.32 <br />$80.67 <br />$20.00 <br />Haul Rig <br />Cost/hr/unit <br />$125.45 <br />$125.45 <br />$88.67 <br />Fleet Size <br />(No. units) <br />1 <br />2 <br />1 <br />Haul <br />Cost/h <br />$175 <br />$412 <br />$108 <br />*eet <br />DOT permit <br />Cost eet <br />$250.00 <br />$500.00 <br />$250.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $696.67 $465.02 $1,000.00 <br />sheet 1 of 2