Laserfiche WebLink
November 24, 2008 <br />Technical Revision Narrative <br />Kiowa County Road & Bridge will import 200 cubic yards of topsoil to replace what has been <br />removed. The topsoil stockpile that is currently on site is 4100 cubic yards. <br />No other topsoil will be imported unless needed to complete the 9 -12 inches of topsoil to <br />cover the effected area. There is topsoil on the remaining pit site that has not been disturbed <br />and can be used for another time. Approximately 2/3 of the pit has been reclaimed in 1994, <br />therefore it will not need more topsoil covering. The portion that has been reclaimed will be <br />reseeded and mowed to control the weeds. Wheat will be planted on the remaining stockpile it <br />will be planted by hand and rolled in with a sheep's foot roller to polk holes in the ground and <br />push seed in and then catch water to help with erosion. <br />Q <br />Rick Spady