Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION - - <br />sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Task #: 006 State : Colorado Permit/job # : M-1985-008 <br />Date : 11/18/2008 County: Huerfano Abbreviation :none <br />User : KAP - Site : Leone-Gardner Gravel Filename : M008-006 <br />Permit or other job action :Bond Recalculation Relative To Inspection <br />Task description : Mobilize/Demobilize <br />EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered <br />400 HP (2nd half <br />2006 <br />, <br />, <br />) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />capaties pacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : ost/hour : $16.63 $18.37 $22.33 <br />= <br />st/hour : $44.38 $46.13 $5007 <br />st/hour `. $27.66 <br />st/hour . $0.00 $25.39 $25.39 <br />st/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine Weight/unit <br />Description (Tons) <br />-Cat D8R Series ll - 8SU (2 52.55 <br />-Cat 627G w/push pull 42.04 <br />-Revegetation Equipment 10.00 <br />Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />$50.32 $125.45 1 $175.77 $125 <br />45 $0 <br />00 <br /> . . <br />$67.01 $117.55 1 $184.56 $117 <br />55 $0 <br />00- <br /> . . <br />$20.00 $88.67 1 $108.67 $88.67 $0.00 <br />Subtotals :I $468.99 $331.67 $0.00