My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-26_PERMIT FILE - M2008080 (5)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008080
>
2008-11-26_PERMIT FILE - M2008080 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:19 PM
Creation date
12/1/2008 10:37:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008080
IBM Index Class Name
PERMIT FILE
Doc Date
11/26/2008
Doc Name
Exhibit L- Reclamation Cost
From
Journey Ventures, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. Journey Ventures, LLC <br />Kersey Gravel 1 <br />11/24/2000f <br />Reclamation Bond Quantities and Costs tpy/icl <br />P 2008 J&T Conswldna Iae. 07113 Journey Ventures Pit Rec Bond Calc! <br />Summary of Unit Costs <br />Direct costs <br />Re-applying topsoil 12" thick <br />Revegetating disturbed area <br />Dewatering full pit <br />Slurry Wall Cost (75 foot average depth) <br />(0-50 ft @ $31ft - 51-70 R @ $4/11- 71-75 IT @ $161ft) <br />Scarifying Ground <br />Mobilization <br />$1,800.00 /acre <br />$1,000.00 /acre <br />$200.00 / million gallons <br />$310.00 / linear foot <br />$200 / acre <br />$2,500 lump sum <br />Overhead and Profit Costs <br />Liability insurance 1.55% of direct cost <br />Performance bond 1.05% of direct cost <br />Profit 10.00% of direct cost <br /> Total Overhead Cost 12.60% of direct cost <br />Proiect Management <br />Engineering and bidding 4.25% of direct cost <br />Management and administration 5.00% of direct cost <br />Total Additional Cost 9.25% of direct cost <br />1 of 5 <br />139
The URL can be used to link to this page
Your browser does not support the video tag.