EXHIBIT E <br />Reclamation Plan <br />A lined water storage reservoir will be the final reclaimed use for the Journey Ventures Pit site. <br />Portions of mining areas in Phases 1, 2, and 11, will be reclaimed as "native" areas, which will <br />be re-seeded with native vegetation. The majority of the mining areas will be reclaimed as a <br />water storage reservoir. The remaining area within the proposed permit boundary will consist of <br />reservoir shoreline, unimproved access roads around the reservoir, and reclaimed or otherwise <br />undisturbed land. <br />Final Land Use Reclamation <br />Plan Area <br />acres Alternate <br />Reclamation Plan <br />Area acres <br />Reservoir Water Surface 56.65 61.36 <br />County Roads/Access Roads 2.46 1.96 <br />Reclaimed Vegetated Land and Undisturbed <br />Land 25.52 21.31 <br />TOTAL 84.63 84.63 <br />Water Storage Reservoir <br />In general, the mining limits will be mined down to the shale/claystone/sandstone bedrock. The <br />relatively impermeable bedrock will make the bottom of the reservoir. The reservoir will be <br />separated from the surrounding alluvial aquifer by the slurry wall liner system as detailed in the <br />cross-section shown on the Reclamation Plan Map. The slurry wall liner will be keyed into the <br />bedrock material and extend upward through the entire height of the alluvium. Design <br />specifications and quality control procedures used during the construction of the slurry wall liner <br />will ensure that the reservoir meets the State Engineer's Office (SEO) performance standards <br />for permeability. The slurry wall liner will be constructed prior to Phase 3 or at some point <br />between Phase 3 and Phase 11. <br />All reservoir slopes will be reclaimed to at least 3H:1 V final grade for elevations above 4581 feet <br />and a 2H:1 V final grade for lower slope of the reservoir below an elevation of 4581 feet. The top <br />of the reservoir starts at elevation 4594 where the anticipated normal water surface will be at an <br />elevation of 4591 feet. Since reclamation will be concurrent with mining, most soil, overburden, <br />and bedrock material excavated during mining will be used almost immediately. Scrapers and <br />dozers and compactors will be used to place the reclaimed slope material along the reservoir <br />perimeters to achieve the final grade. Upon placing the backfill material, 95 percent compaction <br />will be achieved to insure adequate integrity and permeability of the slope. Final reclamation by <br />capping with topsoil and re-vegetating above the expected reservoir water level will follow <br />backfilling operations closely to minimize the amount of disturbance at any one time. <br />During reclamation activities, inlet and outlet facilities for the reservoir will be designed and <br />installed once the operational criteria of the proposed reservoir have been identified by an end <br />user. <br />Journey o W Consulting, lJourney Ventures, LLC. <br />Journey Ventures s Pi91111 t <br />DRMS 112 Permit Application <br />20