My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-26_PERMIT FILE - M2008080
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008080
>
2008-11-26_PERMIT FILE - M2008080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:19 PM
Creation date
12/1/2008 10:23:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008080
IBM Index Class Name
PERMIT FILE
Doc Date
11/26/2008
Doc Name
New 112c Appl. plus Exhibits A thru G
From
Journey Ventures, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Journey Ventures, LLC's development plans for the Journey Ventures Pit anticipate that <br />roadways will cross over Existing and Future Pipelines. Journey Ventures, LLC agrees to abide <br />by maintaining a minimum of 48 inches and not more than 72 inches of cover over all Pipelines <br />during any of Journey Ventures, LLC' operations on the Property except for temporary or <br />emergency circumstances. Petroleum Development Corporation may install and maintain <br />markers on its Petroleum Pipeline Easement. Petroleum Development Corporation shall mark its <br />flowlines at all locations reasonably requested by Journey Ventures, LLC. <br />Journey Ventures, LLC will not allow any extraction to occur, commencing at the surface <br />of the original ground, closer than 25 feet from any Pipeline of Petroleum Development <br />Corporation unless a soils stability report prepared by an engineer licensed in the state of <br />Colorado indicates that a lesser set back will be adequate for preservation of the integrity of said <br />pipeline and provided that upon completion of such extraction Journey Ventures, LLC shall back <br />fill and level the area within 25 feet from any Pipeline. Notwithstanding anything herein to the <br />contrary, in no event shall Journey Ventures, LLC allow any extraction to occur, commencing at <br />the surface of the original ground, closer than 15 feet from any Pipeline without Petroleum <br />Development Corporation's prior written approval. <br />Without Petroleum Development Corporation's consent, Journey Ventures, LLC shall not <br />allow any stockpile of soil to be placed over any Pipeline of Petroleum Development <br />Corporation. <br />When crossing Petroleum Development Corporation Pipelines with heavy equipment, <br />like earth moving equipment, Journey Ventures, LLC will maintain a minimum of four foot and <br />a maximum of six feet of dirt coverage, in addition to the existing cover over the pipeline. When <br />crossing Petroleum Development Corporation pipelines with trucks and lighter equipment, <br />Journey Ventures, LLC will maintain a minimum of two foot and a maximum of six feet of dirt <br />coverage, to the existing cover over the pipeline. <br />The depth of cover over the Petroleum Development Corporation Pipelines shall not be <br />reduced or drainage over Petroleum Development Corporation's pipeline altered without <br />Petroleum Development Corporation's written approval. <br />Any utility crossing must be a minimum of 18" inches vertical separation from Petroleum <br />Development Corporation Pipelines. Parallel utilities must maintain a minimum of ten-foot <br />separation, unless Petroleum Development Corporation grants a lesser distance of separation <br />which grant shall not be unreasonably withheld. <br />Without Petroleum Development Corporation's consent, construction of any permanent <br />structure within Petroleum Development Corporation's Petroleum Pipeline Easement is not <br />permitted. Planting of trees and shrubs is not permitted on Petroleum Development <br />Corporation's Petroleum Pipeline Easement. <br />4. ACCESS. <br />a. Journey Ventures, LLC shall provide Petroleum Development Corporation with <br />non-exclusive access to all of the Oil and Gas Operations Areas and the Petroleum Pipeline <br />Easement. The access roads to be used by Petroleum Development Corporation will be those <br />Page 4 of 10 <br />13
The URL can be used to link to this page
Your browser does not support the video tag.