My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-20_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2008-08-20_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:38 PM
Creation date
11/26/2008 10:27:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
8/20/2008
Section_Exhibit Name
Exhibit 10 Air Pollution Emission Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLORADO <br />Of ~Q'p~ , <br />COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT c <br />AIR POLLUTION CONTROL DIVISION c <br />TELEPHONE: (303) 692-3150 « +R <br />~18T6~ <br />CONSTRUCTION PERMIT <br />PERMIT NO: 03DL0596 <br />INITIAL APPROVAL <br />DATE ISSUED: JANOARY 10, 2005 Modification #2 <br />IssuED To: Bowie Resources, LLC <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Underground coal mine, Bowie No. 2, located 3 miles northeast of Paonia, Delta County, <br />Colorado. <br />''~• <br /> <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: <br />Coal Preparation/Wash Plant. One primary crusher, one secondary crusher, wash screen, <br />and associate conveyors and transfer points. <br />THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR <br />QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND <br />CONTROL ACT C.R.S. (25-7-101 et se , TO THOSE GENERAL TERMS AND CONDITIONS INCLUDED <br />IN THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />1. The particulate emission control measures listed on the attached page (as approved by the <br />Division) shall be applied to the particulate emission producing sources as required by Regulation <br />No. 1. Section III.D.1.b. <br />2. Visible emissions shaA not exceed twenty percent (20%) opacity during normal operation of the <br />source. During periods of startup, process modification, or adjustment of control equipment <br />visible emissions shall not exceed 30% opacity for more than six minutes in any sixty consecutive <br />minutes. Opacity shall be measured by EPA Method 9. (Reference: Regulation 1, Section <br />II.A.1.& 4.) <br />3. The permit number shall be marked on the subject equipment for ease of identification. <br />(Reference: Reg. 3, Part B, IV. E.) (State only enforceable) <br />4. Construction of this source must commence within 18 months of initial approval permit issuance <br />date or within 18 months of date on which such construction or activity was scheduled to <br />commence as stated in the application. If commencement does not occur within the stated time <br />the permit will expire on JOLY 10, 2006 (See General Condition <br />No. 6., Item 1.) (Reference:Regulation 3, Part B, IV.G.4.) <br />/~12-5 J <br />029/0049/015 A~P~oveD <br />3/L//US <br />ver. 2/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.