My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-20_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2008-08-20_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:38 PM
Creation date
11/26/2008 10:26:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
8/20/2008
Section_Exhibit Name
2.03 Legal, Financial, Compliance and Related Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.03.8 Permit Term Information <br />(1) Surface mining activities (open pit or strip mining) are not planned within the <br />permit area. <br />(2) The Bowie No. 2 Mine was constructed and opened during the spring and <br />summer months of 1997 with coal production/development beginning on <br />August 15, 1997 in the D-Seam. This room and pillar operation began <br />developing a main and submain system of underground entries to provide <br />the ventilation, haulage and coal conveyor support for years to come. These <br />entries are driven carefully on projections, held to minimum widths with larger <br />than normal coal pillars left in place to assure adequate support forthe life of <br />the mine. The mine began longwall production during November 1999 and <br />currently produces at the rate of 5 to 6 million tons per year. <br />During 2003 the B-Seam portal bench was constructed with coal <br />development beginning late in 2003. A coal preparation plant was <br />constructed during late 2003 and early 2004. The coal preparation plant <br />began operations during June 2004. The preparation of the new large coal <br />mine waste bank began in late April and was completed in early July, 2004. <br />The Operator constructed an upland conveyor from the B-Seam portal bench <br />to the D-Seam coal preparation facilities during late 2004. <br />Approximately 3750 acres will be affected during the life of the mine plan. <br />(3) The applicant expects to conduct underground mining activities in excess of <br />5 years. The applicant requests a permit term of five years. <br />Permit Renewal `~2 <br />fi R-80 <br />/j PPRovED <br />7~3 i/o7 <br />2.03-17 <br />02/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.