Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, <br />Permit or other job action :Minor Revision 88 <br />Task description : Regrade Light-Use Roads <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />volume : 6,500 BCY factor : 1.250 volume <br />8,125 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br />___ ;. <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />;. <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr _ <br />Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiff/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,500 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.32 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />Adjusted unit production : 399.15 LCY/hr <br />Adjusted fleet production : 399.15 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 20.36 Hours <br />Unit cost : $0.520 /LCY Total job cost : $¢ 22¢ <br />And Safety <br />