Laserfiche WebLink
facilities. Map 11 Surface Facilities and Roads East Portal and Map 12 Surface Facilities <br />and Roads West Portal have been revised to show these facilities. <br />5. Section 2.05.3 beginning on page 2.05-5 has been revised to provide a discussion of the <br />operational plan for the New Elk for the next and future permit terms. New Elk Coal <br />Company requests that the permit boundary as it existed prior to Surety Release SL-1 be <br />reinstated. Map 3 Mine Plan has been revised to show this permit boundary. A New Mine <br />plan has not been shown on Map 3. NECC would prefer to defer presenting a mining plan and <br />timing sequence until after mine re-entry. At the present time it is impossible to determine the <br />best way to access and recover the remaining Allen Seam coal reserves. <br />6. The reclamation plan for the Refuse Disposal Area will be reviewed and revised to <br />include a discussion of final reclamation occurring as a result of any early termination of the <br />mining operation. <br />If you have any questions, please call me. <br />Sincerely, <br />Ronald Thompson <br />Agent <br />Enclosures: <br />Table of Contents Page vii <br />Section 2.05 Pages 2.05-1 to 2.05-8, 2.05-17 <br />Maps 3, 11 and 12 <br />Exhibits 22 and 25