Laserfiche WebLink
5. The adequacy response and revised maps indicate that the proposed 700 cubic yard topsoil pile will no longer be <br />constructed. However, references to this pile on pages D-4, D-14, and E-3 need to be removed from permit text. <br />6. Response acceptable. <br />7. The layout of the proposed contour ditch(s) is not provided in enough detail and does not appear to be a <br />functional design. Please provide detailed information and illustration of the ditch layout and the complete flow <br />path to a pond or drainage capable of handling the increased flow. <br />The reclamation cost estimate for this amendment will be calculated by DRMS upon receipt of your response to these <br />comments. <br />If you need additional information, please contact me at the Division of Reclamation, Mining and Safety, Grand Junction <br />Field Office, 101 South Third Street, Room 301, Grand Junction, Colorado 81501, telephone no. 970-243-6368. <br />Sincerely, <br />Steve S. Shuey <br />Environmental Protection Specialist