Laserfiche WebLink
Division. Liability release for the requested parcels will not affect the $20,378,236.00 value <br />estimated for costs for remaining reclamation. <br />Any person with a valid legal interest which might be adversely affected by this proposed <br />decision may request a formal public hearing before the Mined Land Reclamation Board <br />in accordance with Rule 3.03.2(6). Public notice of this proposed decision will be <br />published twice in the Craig Daily Press for two weeks as soon as possible. Requests for <br />public hearing must be submitted to the Division in writing within thirty days of the first <br />publication in the Craig Daily Press. If no hearing is requested within that thirty days, the <br />Division's proposed decision will become final. <br />Trapper Mine C-1981-010 Bond Release History <br /> Phase I Phase II Phase III <br /> <br />SL-01 2511.7 Liability 1570.5 Liability <br />SL-02 319.5 Liability <br />SL-03 592.7 -1 <br />SL-04 1857.7 Liability Only <br />(2) <br />SL-05 823.9 Liability <br />Only (3) <br />SL-06 819.1 Liability <br />Only (4) <br />SL-07 762'8 <br />5 $371,146.00 <br />SL-08 476.6 Liability <br />Only (6) <br />SL-10 305.0 <br />7 $228,664 <br />Total 3812.2 3301.8 2920.5 <br />(1)The reclamation cost liability associated with this bond release was $1,857,688.00. However, the operator <br />did not request a reduction in the bond amount. <br />(2) The reclamation cost liability associated with this bond release was $82,659. However, the operator did not <br />request a reduction in the bond amount. <br />(3) Reclamation cost liability associated with the backfill portions of Pit D, Pit H, Pit F, Pit Z and Pit A would have <br />been $2,099,120.00, based upon a cost per lineal foot measurement of the pit dimensions. The operator did not <br />request a reduction in the bond amount. <br />(4) The reclamation cost liability associated with this bond release was $2,587,606. The operator did not request <br />a reduction in the bond amount <br />(5) The Division estimated reclamation cost liability of tasks associated with this bond release was $371,146.00. <br />Acreage includes West Buzzard, East Buzzard and Elk reclaimed drainages. The operator requested a reduction <br />of $38,181.00. <br />(6) Reclamation cost liability associated with the backfill portions of Pit D, Pit H, Pit F, and Pit A would have been <br />$7,908,600.00, based upon a cost per lineal foot measurement of the pit dimensions. The operator did not request a <br />reduction in the bond amount. <br />(7) The Division estimated reclamation cost liability of tasks associated with this bond release was <br />$228,664.00. The operator requested a reduction of $40,050.00 <br />Trapper Mine Page 8 November 21, 2007 <br />Phase III Bond Release