My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-04-18_REVISION - M1977493 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
1990-04-18_REVISION - M1977493 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:02:39 PM
Creation date
11/25/2008 10:40:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
4/18/1990
Doc Name
Wastewater Sludge Utilization at the Mayflower Tailing
From
Black & Veatch
To
CDH
Type & Sequence
TR2
Email Name
ACS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
999 <br /> ,(BLACK & VEATCH -',-' <br /> ENGINEERS-ARCHITECTS TEL. (303) 671-4200 <br /> DENVER REGIONAL OFFICE <br /> 1400 SOUTH POTOMAC STREET-SUITE 200 <br /> AURORA.COLORADO 80012 <br /> FAX: (303) 671-4285 <br /> Summit County, Colorado B&V Project 6913.007 <br /> Continuing Consultation on B&V File A <br /> Plant Operations April 16, 1990 <br /> Ito <br /> 1 � <br /> APR 18 139� <br /> MINED <br /> Mr. Phil Hegeman qMAT!ON <br /> �_-G Colorado Department of Healthc/ <br /> 4210 E. 11th Avenue <br /> Denver, Colorado 80220 <br /> Re: Wastewater Sludge Utilization at the Mayflower Tailing Deposition <br /> Faci ty t at serves the Climax Mine. <br /> Dear Phil: <br /> On behalf of Summit County, this document is intended to be the County's <br /> final letter of intent to apply aerobically digested wastewater sludge from <br /> the Snake River WWTP at the Mayflower Tailing Deposition Facility that <br /> serves the Climax Mine. <br /> PURPOSE <br /> The proposed sludge application program will accomplish two objectives. <br /> The program's first goal is to develop another economical outlet for the <br /> sludge so that the County is not totally dependent upon its current <br /> disposal method of contract hauling via Liquid Waste Management. The <br /> County feels that it is prudent to have more than one ultimate disposal <br /> method. The program's second goal is to beneficially reuse sludge <br /> nutrients to help reclaim the tailing areas. <br /> SITE <br /> The proposed site is the Climax Mine Mayflower Tailing Deposition Area and <br /> as shown on Figure 1, this parcel is located about 25 highway miles from <br /> the Snake River WWTP. The map shows the proposed route that the sludge <br /> transportation vehicles would use to deliver sludge from the treatment <br /> plant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.