My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-20_ENFORCEMENT - C1981019
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981019
>
2008-11-20_ENFORCEMENT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:07 PM
Creation date
11/24/2008 10:45:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
ENFORCEMENT
Doc Date
11/20/2008
Doc Name
Request for 90 Day Extension of NOV (Memo)
From
Jim Stark
To
Ron Cattany
Violation No.
CV2008004
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of CO<o <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />* 1876 i <br />EXTENSION OF TIME FOR ABATEMENT NOTICE <br />FOR NOTICE OF VIOLATION OR CESSATION ORDER FOR COAL OPERATION <br />TO: THE OPERATOR AND PERMITTEE OF THE MINE DESCRIBED BELOW <br />CESSATION ORDER NO.: <br />DATE NOV OR CO ISSUED: 26 August 2008 <br />MINE: Colowyo Mine <br />OPERATOR (IF OTHER THAN PERMITTEE:) <br />SAME <br />MAIL ADDRESS: SAME <br />NOTICE OF VIOLATION NO.: CV-2008-004 <br />PERMIT NO.: C-1981-019 <br />COUNTY: Moffat and Rio Blanco <br />TYPE OF MINE: Surface/Federal <br />PERMITTEE: Colowyo Coal Company <br />MAIL ADDRESS: 5731 State Highway 13 <br />Meeker, Colorado 81641 <br />In (a) Notice of Violation No. CV-2008-004 , (b) Cessation Order No. , <br />the deadline for abatement of the practice, condition or violation described was fixed at <br />24 November 2008 <br />It is hereby found that the operator has failed to abate such practice, condition or <br />violation, or cannot complete abatement within the time allowed, but that such failure is not <br />due to lack of diligence on the part of the operator. The time for abatement is therefore <br />extended to: 20 February 2009 for abatement 1 and 24 December 2008 for abatement 5. <br />The conditions, practices or violation as to which this extension applies are as follows: <br />This abatement extension applies to steps 1 and 5 of the violation. Abatement step 1 is the requirement clean <br />the Prospect Pond and abatement step 5 is the requirement to submit a Technical Revision to the Division <br />detailing a short-term reclamation schedule for the Prospect Drainage in the East Pit. <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />By T-- -?? <br />(Signature of Authorized Representative) [Signat re of Di si n Director, if extension is <br />beyond 90 da ursuant to Rule 5.03.2(2)(e)]* <br />Date of Issue: 20 November 2008 *The Division's justification for approving the <br />extension beyond 90 days is attached. <br />Environmental Protection Specialist <br />(Please print name and title) <br />WHITE - File YELLOW - Operator PINK - Specialist <br />m:\coal\share\forms\Ext Abate
The URL can be used to link to this page
Your browser does not support the video tag.