My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-21_REVISION - C1981033
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2008-11-21_REVISION - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:11 PM
Creation date
11/21/2008 2:28:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
REVISION
Doc Date
11/21/2008
Doc Name
Letter & Application
From
J.E. Stover & Associates Inc
To
DRMS
Type & Sequence
MR29
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OF'?OGp <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />d <br />APPLICATION FORM FOR A REVISION ??1'?o? amor9 <br />TO A COAL MINING AND RECLAMATION PERMIT ®?oro?"'r 50101 <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 'I.0$?3), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right corner of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 1981 - 033 Date: 11 / 19 / 2008 <br />Permittee: Bear Coal Company, Inc. <br />Bear No. 3 Mine <br />Street: P.O. Box 1754 <br />City: Paonia <br />State: CO Zip Code: 81428 _ <br />Brief Description of Revision: Incorporate an updated CDPS Discharge permit into the <br />permit application package. <br />Public Notice Attached: Yes _ No 6" (Required for PRs and TRs) <br />Bond Increase: Yes - No ? Federal ? Non-Federal _ Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed 0 . 0 Acres <br />Permit 0 , 0 Acres <br />Affected 0 . 0 Acres <br />Mineral Ownership - <br />Mineral Private 0 Acres <br />Mineral Federal 0 . 0 Acres <br />Surface Ownership - <br />Private Land 0 0 Acres <br />Federal Land 0 0 Acres <br />State Land 0 0 Acres <br />Mineral State (+/-) 0 0 Acres
The URL can be used to link to this page
Your browser does not support the video tag.