J&T Consulting, Inc. GP West Ranches LFarmLC <br />Pit <br />11/11/2008 <br />pReclamation Bond Quantities and Costs tpy/wss <br />AT Connally Inc. 07115 GP Ranches Rec Bond cal <br />Phase 9 (9.65 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Liner Required to Close Phase 8 (Credit) - Shell (132,844) cyd $ 2.25 $ (298,900) <br />Liner Required to Close Phase 8 (Credit) - Core (60,096) cyd $ 3.25 $ (195,313) <br />Permanent liner - Shell 76,844 cyd $ 2.25 $ 172,900 <br />Permanent liner - Core 34,763 cyd $ 3.25 $ 112,980 <br />Liner Required to Close Phase 9 - Shell 208,756 cyd $ 2.25 $ 469,700 <br />Liner Required to Close Phase 9 - Core 94,437 cyd $ 3.25 $ 306,920 <br />Topsoil Area Above Water 2.5 ac $ 2,000 $ 5,058 <br />Revegetate Area Above Water 2.5 ac $ 1,000 $ 2,529 <br />Dewatering of Full Pit 147.6 Mil. Gal. $ 200.00 $ 29,522 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 607,896 <br />Overhead and Profit Cost (12.60%) $ 76,595 <br />Contract Cost 684,490 <br />Project Management (9.25%) $ 56,230 <br />Additional Financial Warranty Required For Phase 9 $ 740,721 <br />Phase 10 (9.58 acres) <br />(Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Liner Required to Close Phase 9 (Credit) - Shell (131,911) cyd $ 2.25 $ (296,800) <br />Liner Required to Close Phase 9 (Credit) - Core (59,674) cyd $ 3.25 $ (193,941) <br />Permanent liner - Shell 207,822 cyd $ 2.25 $ 467,600 <br />Permanent liner - Core 94,015 cyd $ 3.25 $ 305,548 <br />Liner Required to Close Phase 10 - Shell 76,844 cyd $ 2.25 $ 172,900 <br />Liner Required to Close Phase 10 - Core 34,763 cyd $ 3.25 $ 112,980 <br />Topsoil Area Above Water 2.5 ac $ 2,000 $ 5,041 <br />Revegetate Area Above Water 2.5 ac $ 1,000 $ 2,521 <br />Dewatering of Full Pit 146.5 Mil. Gal. $ 200.00 $ 29,295 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 607,644 <br />Overhead and Profit Cost (12.60%) $ 76,563 <br />Contract Cost 684,207 <br />Project Management (9.25%) $ 56,207 <br />Additional Financial Warranty Required For Phase 10 $ 740,414 <br />6 of 11 <br />95