J&T Consulting, Inc. GP Ranches LLC <br />VReciamati West Farm Pit <br />1 1 /11 /200 <br />ond Quantities and Costs tpy/wss <br />© 2008 JaT Coupplid>uL Inea 07115 GP Ranches Rec Bond Cal <br />Phase 5 (8.36 acres) <br />lReclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Permanent liner - Shell 290,889 cyd $ 2.25 $ 654,500 <br />Permanent liner- Core 131,593 cyd $ 3.25 $ 427,676 <br />Liner Required to Close Phase 5 - Shell 92,400 cyd $ 2.25 $ 207,900 <br />Liner Required to Close Phase 5 - Core 41,800 cyd $ 3.25 $ 135,850 <br />Topsoil Area Above Water 3.4 ac $ 2,000 $ 6,788 <br />Revegetate Area Above Water 3.4 ac $ 1,000 $ 3,394 <br />Dewatering of Full Pit 115.6 Mil. Gal. $ 200.00 $ 23,114 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 1,461,722 <br />Overhead and Profit Cost (12.60%) $ 184,177 <br />Contract Cost 1,645,899 <br />Project Management (9.25%) $ 135,209 <br />Additional Financial Warranty Required For Phase 5 $ 1,781,108 <br />Phase 6 (8.37 acres) <br />lReclamation Operation - Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Liner Required to Close Phase 5 (Credit) - Shell (92,400) cyd $ 2.25 $ (207,900) <br />Liner Required to Close Phase 5 (Credit) - Core (41,800) cyd $ 3.25 $ (135,850) <br />Permanent liner - Shell 172,978 cyd $ 2.25 $ 389,200 <br />Permanent liner - Core 78,252 cyd $ 3.25 $ 254,319 <br />Liner Required to Close Phase 6 - Shell 114,022 cyd $ 2.25 $ 256,550 <br />Liner Required to Close Phase 6 - Core 51,581 cyd $ 3.25 $ 167,640 <br />Topsoil Area Above Water 2.5 ac $ 2,000 $ 5,083 <br />Revegetate Area Above Water 2.5 ac $ 1,000 $ 2,541 <br />Dewatering of Full Pit 127.4 Mil. Gal. $ 200.00 $ 25,476 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 759,558 <br />Overhead and Profit Cost (12.60%) $ 95,704 <br />Contract Cost 855,263 <br />Project Management (9.25%) $ 70,259 <br />Additional Financial Warranty Required For Phase 6 $ 925,522 <br />4 of 11 <br />93