My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-20_PERMIT FILE - M2008078 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008078
>
2008-11-20_PERMIT FILE - M2008078 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:08 PM
Creation date
11/20/2008 2:33:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
PERMIT FILE
Doc Date
11/20/2008
Doc Name
New Appl., Ex. L- Reclamation Cost
From
GP Ranches, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. GP Ranches LI <br />West Farm <br />11/11/2( <br />Bond Quantities and Costs <br />07115 GP Ranches Rec Bond <br />Phase 19 (11.87 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Liner Required to Close Phases 3,4 (Credit) - Shell (163,778) cyd $ 2.25 $ (368,500) <br />Liner Required to Close Phases 3,4 (Credit) - Core (80,524) cyd $ 3.25 $ (261,703) <br />Permanent Liner - Shell 154,444 ac $ 2.25 $ 347,500 <br />Permanent Liner - Core 75,935 ac $ 3.25 $ 246,789 <br />Topsoil Area Above Water 1.9 ac $ 2,000 $ 3,829 <br />Revegetate Area Above Water 1.9 ac $ 1,000 $ 1,915 <br />Dewatering of Full Pit 161.7 Mil. Gal. $ 200.00 $ 32,345 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 4,675 <br />Overhead and Profit Cost (12.60%) $ 589 <br />Contract Cost $ 5,264 <br />Project Management (9.25%) $ 432 <br />Additional Financial Warranty Required For Phase 19 $ 5,696 <br />Total Financial Warranty Required For All Phases $ 13,741,033 <br />11 of 11 <br />100
The URL can be used to link to this page
Your browser does not support the video tag.