Laserfiche WebLink
:.. <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />CosVhr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $58.37 1 $58.37 $58.37 <br />-Light Duty Pickup, 4x4, 314 T. $46.40 1 $46.40 $46.40 <br />-Fuel Tanker, 4x2, 170 HP $63.62 1 $63.62 $63.62 <br />-Lube Truck, 4x2, 170 HP $71.52 1 $71.52 $71.52 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $239.91 $239.91 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- I Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) = 0.17 0.17 <br />Return time (hours) = 0.17 0.17 <br />Loading time (hours) = 1.00 NA <br />Unloading time (hours) = 1.00 NA <br />Subtotals = 2.33 0.33 <br />Total non-roadable mob/demob cost' : <br />two round hips with haul rig <br />Total roadable mob/demob cost <br />•• one round trip, no haul rig <br />5.0 miles <br />30.0 mph <br />$1,612.03 <br />$79.97 <br />JOB TIME AND COST Total job time : 4.67 hours <br />Total job cost : $1,692 <br />Leadville