My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-07_REVISION - M2000030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000030
>
2008-01-07_REVISION - M2000030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:17:07 PM
Creation date
11/20/2008 2:02:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000030
IBM Index Class Name
REVISION
Doc Date
1/7/2008
Doc Name
Amendment approval
From
DRMS
To
Elam Construction, Inc.
Type & Sequence
AM1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 003 State : Colorado Permit/job# : M-2000-030 <br />Date <br />User <br />12/27/2007 <br />KAP <br />County :La Plata <br />Site :Agri-Dld Gravel Pit <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action :Amendment <br />Task description :Grade Pit Floor <br />.. .:........... .... .... <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no..2 :3-shank ripper <br />Shiftbasis : 1 per day <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fl eet cost/hour : $207.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 17,600 CCY factor : 1.125 volume : 19,800 LCY <br /> <br />Source of estimated volume : Reclamation Plan <br />Source of estimated swell factor : Earth - Dry Packed <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshiflday) <br />Consolidated stockpile Spoil pile: 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,600 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.45 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 408.39 LCY/hr <br /> Adjusted fleet production : 408.39 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 48.48 Hours <br />Unit cost : $0.508 /LCY Total job cost : $10,062 <br /> <br />Abbreviation :none <br />Filename :M030-003 <br />Horsepower: 405
The URL can be used to link to this page
Your browser does not support the video tag.