My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-07_REVISION - M2000030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000030
>
2008-01-07_REVISION - M2000030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:17:07 PM
Creation date
11/20/2008 2:02:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000030
IBM Index Class Name
REVISION
Doc Date
1/7/2008
Doc Name
Amendment approval
From
DRMS
To
Elam Construction, Inc.
Type & Sequence
AM1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Task #: 009 State : Colorado Permit/job # : M-2000-030 <br />Date : 1212812007 County :La Plata Abbreviation : none <br />User : KAP Site :Agri-Dld Gravel Pit Filename : M030-009 <br /> <br />Permit or other job action :Amendment <br />Task description :Mobi/ize/Demob//?Ze <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour:, $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D9R - 9SU (2005) 66.73 $62.35 $125.45 1 $187.80 $125.45 $0.00 <br />-CAT 938G high lift (2003) 14.62 $16.13 $88.67 1 $104.80 $88.67 $0.00 <br />-Revegetation Equipment 10.00 $20.00 $88.67 2 $217.34 $177.34 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : 1$509.94 $391.46 $0.00
The URL can be used to link to this page
Your browser does not support the video tag.