My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-09_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2008-01-09_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:19:07 PM
Creation date
11/20/2008 2:02:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
1/9/2008
Doc Name
Extension of time to submit bond
From
DRMS
To
Wildcat Mining Corp.
Type & Sequence
SO2
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />January 9, 2008 <br /><??Mike Clements <br />Wildcat Mining Corp. <br />3643 Baker St. <br />W <br />V-4 COLORADO <br />D I V I S I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />San Diego, CA 92117 <br />V11, V <br />Re: May Day Mine, Permit M-1981-185, Bond Recalculation for Permit Transfer SO-2, <br />Extension of Time to Submit Bond. <br />Dear Mr. Clements, <br />This is a 60-day extension of time to submit the required bond increase for the May Day Mine, <br />identified above. I am approving this extension due to the apparent confusion over the different <br />bond increase and submittal date regarding your adjoining permitted area (the Idaho Mine and <br />Mill). These two sites, though possibly operated together, are under different permits and require <br />separate bonds. <br />As the attached 11/20/07 letter indicates, the present May Day Mine bond is $5,421 and the new <br />total bond required is $10,881. This means that the additional bond amount needed is $5,460. <br />According to statute, the additional bond must be provided within 60 days of notification, making <br />this increase due by March 10, 2008. Please see the attached letter and bond calculation packet <br />for additional details regarding the figures and bond submittal information. <br />Sincerely, <br />Bob Oswald <br />Environmental Protection Specialist <br />Encl: 11/20/07 letter and bond estimate packet <br />Ec (w/o encl): Tony Waldron, DRMS <br />Elizabeth Taliaferro, DRMS <br />Cc (w/encl): John Ferguson, Wildcat Mining Corp., PO Box 2030, Durango, CO 81302 <br />(c:\08-01 docs/mayday sot fw incr ext/rco) <br />Office of Office of <br />Mined Land Reclamation Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.