Laserfiche WebLink
Design Criteria <br /> <br />Topic Design Criteria for the Proposed Action <br /> 18. Road construction plans would identify specific locations Road Use <br /> of drainage features and BMPs for approval by the FS Permit (FSM <br /> engineer/permit administrator prior to construction. 2733.04b <br /> and FSM <br /> 7730), <br /> Forest <br /> Service <br /> Roads Policy <br /> 19. Road design packages will be submitted to the FS for Forest Plan <br /> approval prior to any construction activity. Roads open to <br /> the public (Levels 3, 4 & 5) will require written approval <br /> prior to any construction activity. <br /> 20. Project access roads will be gated and closed year-round RACR <br /> to the general public. Personnel with access will be <br /> monitored to insure such access is not abused; i.e., no <br /> access during non-working hours for purposes unrelated <br /> to the project such as hunting or off-roading. <br /> 21. All new access roads constructed for the sole use of this RACR, 36 <br /> project will be decommissioned by full obliteration when CFR 228 E, <br /> no longer needed for the project and reclaimed. Road Use <br /> Permit (FSM <br /> 2733.04b <br /> and FSM <br /> 7730) <br /> 22. Road work will be performed only upon authorization of Road Use <br /> the District Ranger and comply with the terms of MCC's Permit (FSM <br /> Road Use Permit. Roads will be designed and constructed 2733.04b <br /> to provide maximum stability and protect the surface and FSM <br /> resource. Best Management Practices will be used in 7730) MCC <br /> designing the roads and during construction. All roads Project Plan <br /> will be upgraded or constructed to USFS specified <br /> standards for either temporary or classified roads, as <br /> appropriate and approved by the USFS, with a design <br /> speed of 15 miles per hour. <br /> 23. Surface disturbance will be minimized to the extent Forest Plan, <br /> reasonably feasible in order to limit potential impacts. 36 CFR 228 <br /> Soil that is removed from all new disturbance areas will E, MCC <br /> be windrowed or stockpiled for use in reclamation. Project Plan, <br /> Topsoil will be segregated from subsoil and stored at a Road Use <br /> depth no greater than that prescribed by the Paonia Permit(FSM <br /> District Ranger. No soil generated from excavation, slide 2733.04b <br /> removal or other operations shall be deposited within the and FSM <br /> WIZ of any drainage with flowing water. 7730), <br /> WCPH (FISH