My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-09_REVISION - C1980007 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2008-06-09_REVISION - C1980007 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:32:40 PM
Creation date
11/20/2008 11:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
6/9/2008
Doc Name
GMUGs conveying post-mining land use direction & Protections & formal consent/concurrence to OSM
From
USFS
To
OSM & DRMS
Type & Sequence
TR111
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design Criteria <br />Topic Design Criteria for the Proposed Action <br /> 2509.25) <br /> 24. All disturbed and inactive areas (cut/fill slopes) and soil BMP, <br /> stockpiles shall be seeded with a USFS approved WCPH (FSH <br /> temporary seed mixture within 7 days following 2509.25) <br /> disturbance to prevent noxious weed infestation and <br /> minimize erosion <br /> 25. All construction, reconstruction, and improvements will WCPH(FSH <br /> be stabilized by installation of drainage structures, where 2509.25) , <br /> determined appropriate by the responsible USFS official, Road Use <br /> concurrently with construction or maintenance activities. Permit (FSM <br /> These structures shall be maintained for the duration of 2733.04b <br /> the project and shall not be removed, without approval, and FSM <br /> prior to reclamation of the disturbance. Any culverts will 7730) <br /> be sized to safely pass the runoff from a 25-year event <br /> and to withstand flows from a 50-year event. The USFS <br /> will approve culvert sizes and lengths. Filter material will <br /> be installed below drainage outlets and down slope from <br /> rolling dips. Riprap will be installed below culvert outlets <br /> when directed by the USFS. <br /> 26. At road intersections with existing drainages, which Road Use <br /> cannot be easily carried by use of a temporary culvert, Permit (FSM <br /> crossings will be established. The approaches to any 2733.04b <br /> crossing shall be armored by placing a minimum 8-inch and FSM <br /> depth of 1- to 3-inch clean crushed rock, 14 feet wide for 7730), <br /> a distance of 20 feet on each side of the drainage to WCPH (FSH <br /> minimize siltation, bank rutting, and erosion. Crossings 2509.25), <br /> will be constructed perpendicular to the flow line. When <br /> access is no longer needed, any temporary culverts, <br /> associated fill, and crushed rock shall be removed. Silt <br /> fences or appropriate sediment control devices shall be <br /> utilized to prevent siltation into existing drainages, ponds, <br /> or associated riparian areas. <br /> 27. The road surface will be constructed with an in-slope of 2 Road Use <br /> percent and the surface width shall not exceed 14 feet Permit (FSM <br /> except in locations that require curve widening, or those 2733.04b <br /> designated for turnouts. These locations must be and FSM <br /> identified on the ground and approved by the responsible 7730) <br /> USFS official. Side-casting will not be permitted where <br /> side slopes exceed 40 percent.
The URL can be used to link to this page
Your browser does not support the video tag.