My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-09_REVISION - C1980007 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2008-06-09_REVISION - C1980007 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:32:40 PM
Creation date
11/20/2008 11:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
6/9/2008
Doc Name
GMUGs conveying post-mining land use direction & Protections & formal consent/concurrence to OSM
From
USFS
To
OSM & DRMS
Type & Sequence
TR111
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />Design Criteria' <br />Topic_ Design Criteria for the Proposed Action <br />edition)) for public roads (Service Levels 3, 4 and 5) or as Road Use <br />approved by Forest Engineer, to be designed by a Permit (FSM <br />Colorado Registered 2733.04b <br /> and FSM <br /> 7730), 36 <br /> CFR 228 E <br />8. Professional Engineer, and submitted for USFS approval Forest Plan, <br />for each road segment. The Engineer's recommendations AASHTO <br />must be approved and implemented before any project Design <br />related traffic may use that part of the NFSR system. Standard, <br />During the course of the project the Forest Service will Road Use <br />provide oversight of road improvement activities and Permit (FSM <br />continued FS Engineering/FS designee monitoring of 2733.04b <br />road conditions resulting from project related traffic. and FSM <br />Temporary roads that are not open to the public are not 7730), 36 <br />subject to AASHTO engineering standards for low <br />CFR 228 E <br />volume roads. <br />9. For roadway section with 6 inches OR LESS of new Road Use <br />structural surfacing section or existing surfacing sections Permit (FSM <br />with any aggregate segregation or contamination by 2733.04b <br />intruding fine materials, no rutting, pumping or plastic and FSM <br />deformation of the roadway surface will be allowed. 7730), <br />Rutting, plastic deformation, or pumping of the surface BMP, <br />will result in the proponent's operations, on that road, GMUG <br />ceasing immediately and remaining shutdown until Forest <br />repairs and improvements are made to prevent additional <br />Standard <br />damage to the structural section. For surfacing sections <br />with GREATER THAN 6 inches of new structural <br />surfacing section any rutting, pumping or plastic <br />deformation in excess of structural section thickness (T) <br />divided by 3 (T/3) will not be allowed and will result in <br />proponent's operations, on that road, ceasing immediately <br />and remaining shutdown until repairs and improvements <br />are made to prevent additional rutting. <br />10. This T/3 limitation applies to any forest road utilized by Road Use <br />the proponent, even if it is not part of the project area or Permit (FSM <br />transportation plan. Once §hutdown, operations will not 2733.04b <br />resume until approved repairs or improvements are made and FSM <br />to resolve the problem. These limitations apply to any 7730) <br />NFSR even if it is not included in the project area or BMP, <br />transportation plan. GMUG
The URL can be used to link to this page
Your browser does not support the video tag.