My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-09_REVISION - C1980007 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2008-06-09_REVISION - C1980007 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:32:40 PM
Creation date
11/20/2008 11:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
6/9/2008
Doc Name
GMUGs conveying post-mining land use direction & Protections & formal consent/concurrence to OSM
From
USFS
To
OSM & DRMS
Type & Sequence
TR111
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design Criteria <br /> <br />Topic Design Criteria for the Proposed Action <br /> 125. Armor well pad fill slopes with excavated rock and/or BMP <br /> slash vegetation (brush, branches, and other slash <br /> vegetation) to reduce the velocity of rain drops and <br /> subsequent erosion. <br /> 126. All areas not necessary for the continued operation of the MCC Project <br /> wells would be reclaimed after drilling is complete. Plan, FS <br /> 127. All cut slopes would be aggressively re-vegetated (hydro- BMP, State <br /> mulch seeded and fertilized, if necessary) following the <br /> completion of construction to help stabilize these <br /> disturbed sites. <br /> 128. Post-construction seeding applications would continue Forest Plan, <br /> until determined successful by the Forest Service. CO DRMS <br />Onsite Inspections 129. Prior to any construction, onsite inspections with 36 CFR 228 <br /> appropriate regulatory agencies will be held to discuss E <br /> site-specific concerns. <br />DRILLING & COMPLETION OF MDWS <br />Mud Pits 130. When the mud pits are sufficiently dry they will be filled 36 CFR 228 <br /> with stored sub-soil material and compacted to minimize E <br /> any settling. <br />Water use 131. Drilling water will be reused as available. MCC Project <br /> Plan <br />OPERATIONS & MAINTENANCE ACTIVITIES <br />De-gas installation 132. Degassing trailer will be enclosed with a fence with a MCC Project <br /> locking gate to preclude public, livestock, and wildlife Plan <br /> entry. <br /> 133. Equipment will be inspected by MSHA prior to <br /> installation. <br />Monitoring of 134. Twice daily initial inspections of active de-gas MCC Project <br />MDWs installation then decreasing to weekly. Plan <br />RECLAMATION ACTIVITIES <br />Revegetation 135. Subsurface ripping would be used to reduce compaction BMP <br /> prior to replacement of the topsoil and seeding. <br /> 136. Successful revegetation (measured by 75 percent cover of Forest Plan <br /> adjacent undisturbed ground after 2 growing seasons in <br /> upland areas and 80 percent ground cover in riparian <br /> areas) of disturbed ground with native vegetation.
The URL can be used to link to this page
Your browser does not support the video tag.