Laserfiche WebLink
Table No. 5 <br />Water Balance <br />Northern Colorado Constructors, Inc. <br />NCCI Pit #1 <br /> <br /> <br />Month: <br />Total <br />Depletions <br />(ac=ft) <br /> <br />A.. <br />Transit <br />'Loss <br />(ac-ft <br />) <br />B Lease from <br />City of , <br />Thornton <br /> <br />(ac-ft). <br />(Cl <br />Net <br />River-:Balance." ' <br /> <br />(ac-ft) <br />D <br />Jan-09 1.96 0.27 2.23 0.0 <br />Feb-09 1.58 0.22 1.80 0.0 <br />Mar-09 1.74 0.24 1.98 0.0 <br />Apr-09 1.88 0.26 2.14 0.0 <br />May-09 2.36 0.33 2.69 0.0 <br />Jun-09 2.82 0.39 3.21 0.0 <br />Jul-09 3.56 0.50 4.06 0.0 <br />Aug-09 4.03 0.56 4.59 0.0 <br />Sep-09 4.04 0.57 4.61 0.0 <br />Oct-09 3.96 0.55 4.51 0.0 <br />Nov-09 3.46 0.48 3.94 0.0 <br />Dec-09 3.08 0.43 3.51 0.0 <br />Total 34.47 4.83 39.30 0.0 <br />Notes: <br />(A) Total depletions at NCCI Pit #1 from Table No. 4 <br />(B) Transit loss from Metro WWTP assumed at 0.5% per mile for 28 miles <br />(C) Replacements from City of Thornton <br />(D) Net River Balance, (C)-((A)+(B)) <br />clearWATERsolutions <br />water rights • planning - engineering