Laserfiche WebLink
Mac <br />DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />Bill Ritter, Jr. <br />Governor <br />November 12, 2008 Harris D. Sherman <br />Executive Director <br />Dick Wolfe, P.E. <br />Rachel Kullman RECOVED Director <br />Clear Water Solutions <br />8010 S. Country Road 5, Ste. 105 ?y 19 2008 <br />Windsor, CO 80528 Division or i<eciamauorr. <br />Mining and SeeV <br />RE: Substitute Water Supply Plan NCCI Pit #1, M-2001-107 (WDID 0202566) <br />Section 24, T2N, R67W, 6th P.M. <br />Water Division 1, Water District 2, Weld County <br />Approval period: January 1, 2009 through December 31, 2009 <br />Contact phone number for Ms. Rachel Kullman: 970-223-3706 <br />Dear Ms. Kullman: <br />We have received your letter of October 31, 2008, requesting renewal of the above <br />referenced substitute water supply plan to cover depletions caused by an existing gravel mining <br />operation operated by Northern Colorado Constructors, Inc. ("Applicant'). The required fee of <br />$257.00 for the renewal of this substitute supply plan ("SWSP") has been submitted (receipt no. <br />3634749). The original supply plan was approved on December 30, 2002 and the SWSP was <br />most recently renewed on January 8, 2008. <br />Plan Operation <br />This plan seeks to replace depletions resulting from mining at the NCCI Pit #1 ("NCCI <br />Pit' - WDID 0203016). There will be a dewatering trench around the active mining cell. Water <br />from the trench will be collected in a process water pond then pumped to a sedimentation <br />pond. After sedimentation, the water will be returned to Little Dry Creek where it will flow back <br />to the South Platte River. In addition, the dewatering trench will include two 20 ft x 300 ft and <br />two 20 ft x 200 ft ponds; another 100 ft x 200 ft pond will be used for process water for the <br />concrete plant. The total exposed water surface at the site is 2.73 acres. <br />In order to provide a buffer to neighboring wells from dewatering, the Applicant <br />constructed two recharge ditches on the southern end of the property. The Applicant will place <br />a portion of its dewatering water into these recharge ditches. <br />Depletions at the site will result from evaporation, water lost in mined product, concrete <br />production, asphalt production and dust control. The lagged depletions will be replaced using <br />fully consumable effluent leased from the City of Thornton ("Thornton"). <br />The reclamation plan for the NCCI Pit is to place a compacted clay liner around the <br />interior of the mine slopes for the purpose of preventing groundwater seepage from entering <br />the pit. The applicant has bonded for lining of the pit through the Colorado Division of <br />Reclamation Mining & Safety. <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303-866-3581 • Fax: 303-866-3589 <br />www.water.state.co.us