My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-18_REVISION - C1981008 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2008-11-18_REVISION - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:02 PM
Creation date
11/19/2008 11:26:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
11/18/2008
Doc Name
Adequacy Review
From
Greg Lewicki & Associates
To
DRMS
Type & Sequence
SL11
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16) No corrections, clarifications, or confirmations made, as none were requested by DRMS. <br />17) Additional letters have been sent out to the remaining parties as described by Rule 3.03.2(1), <br />copies of which have been added to Appendix A. <br />18) The areas stated within the bond release report are correct: 241.5 acres of Irrigated Pasture <br />and 62 acres of Dryland Pasture. The discrepancy is due to BIO-Logic's areas being approximate <br />areas based on loosely drawn lines. A memo from BIO-Logic explaining this has been added to <br />Appendxi B. For the purposes of bond release, the areas contained within the report should be <br />used. <br />Road acreages are present in the Requested Phase 2 New Horizon #2 Mine Areas table. <br />19) Phase 2 release criteria is covered in the attached replacement text, along with details of the <br />requested release areas' meeting of this criteria. <br />20) All of the areas shown on Maps R-1 and R-2 are covered by the Phase 1 and Phase 2 bond <br />release request, respectively. No Phase 3 bond release is requested of any area. <br />21)The added section on Phase 2 release criteria addresses this concern. <br />22) This area has been removed from the delineated Phase 2 Area 8 bond release area. Map R-2 <br />has been updated to reflect this correction. <br />23) It has been confirmed with Western Fuels that the contours present on the map are correct for <br />the reclaimed roads. <br />24) Appendix D has been renamed in the replacement text. <br />In addition to the individual items listed above, the maps and text have been updated to reflect <br />more accurate acreages for the bond release. A replacement Map R-2 and replacement text is <br />attached to this letter. These are the only elements of the bond release which have changed <br />Sincerely, <br /> <br />Ben Langenfeld, Project Engineer <br />Greg Lewicki and Associates <br />cc: Ross Gubka
The URL can be used to link to this page
Your browser does not support the video tag.