Laserfiche WebLink
Trapper Mine C-1981-010 Bond Release History <br /> Phase I Phase II Phase III <br /> Acres Amount Acres Amount Acres Amount <br />SL-01 2511.7 Liability 1570.5 Liability <br />SL-02 319.5 Liability <br />SL-03 592.7 (1) <br /> 1857 <br />7 Liability Only <br />SL-04 . (2) <br /> 823.9 Liability <br />SL-05 Only (3) <br /> 819 <br />1 Liability <br />SL-06 . Only (4) <br /> 762.8 $371 <br />146.00 <br />SL-07 5 , <br /> 305.0 $228 <br />664.00 <br />SL-10 6 , <br />Total 3335.6 3301.8 2925.5 <br />(1)The reclamation cost liability associated with this bond release was $1,857,688.00. However, the operator <br />did not request a reduction in the bond amount. <br />(2) The reclamation cost liability associated with this bond release was $82,659. However, the operator did not <br />request a reduction in the bond amount. <br />(3) Reclamation cost liability associated with the baclfill portions of Pit D, Pit H, Pit F, and Pit A would have been <br />$7,908,600.00, based upon a cost per lineal foot measurement of the pit dimensions. The operator did not request a <br />reduction in the bond amount. <br />(4) The reclamation cost liability associated with this bond release was $2,587,606. The operator did not request <br />a reduction in the bond amount <br />(5) The Division estimated reclamation cost liability of tasks associated with this bond release was $371,146.00. <br />Acreage includes West Buzzard, East Buzzard and Elk reclaimed drainages. The operator requested a reduction <br />of $38,181.00. <br />(6) The Division estimated reclamation cost liability of tasks associated with this bond release was <br />$228,664.00. The operator requested a reduction of $40,050.00 <br />Trapper Mine Page 13 November 17, 2007 <br />Phase III Bond Release