Laserfiche WebLink
Trapper Mine C-1981-010 Bond Release History <br /> Phase I Phase II Phase III <br /> Acres Amount Acres Amount Acres Amount <br />SL-01 2511.7 Liability 1570.5 Liability <br />SL-02 319.5 Liability <br />SL-03 592.7 (1) <br /> <br />SL-04 1857.7 Liability Only <br />(2) <br /> <br />SL-05 823.9 Liability <br />Only (3) <br /> <br />SL-06 819.1 Liability <br />Only (4) <br /> <br />SL-07 762.8 <br />5 $371,146.00 <br /> <br />SL-10 305.0 <br />g $228,664.00 <br />Total 3335.6 3301.8 2925.5 <br />(1)The reclamation cost liability associated with this bond release was $1,857,688.00. However, the operator <br />did not request a reduction in the bond amount. <br />(2) The reclamation cost liability associated with this bond release was $82,659. However, the operator did not <br />request a reduction in the bond amount. <br />(3) Reclamation cost liability associated with the backfill portions of Pit D, Pit H, Pit F, and Pit A would have been <br />$7,908,600.00, based upon a cost per lineal foot measurement of the pit dimensions. The operator did not request a <br />reduction in the bond amount. <br />(4) The reclamation cost liability associated with this bond release was $2,587,606. The operator did not request <br />a reduction in the bond amount <br />(5) The Division estimated reclamation cost liability of tasks associated with this bond release was $371,146.00. <br />Acreage includes West Buzzard, East Buzzard and Elk reclaimed drainages. The operator requested a reduction <br />of $38,181.00. <br />(6) The Division estimated reclamation cost liability of tasks associated with this bond release was <br />$228,664.00. The operator requested a reduction of $40,050.00 <br />Trapper Mine Page 13 November 17, 2007 <br />Phase III Bond Release