Laserfiche WebLink
ORIGINAL - PUBLIC RILE ° ' „ • : <br />(Page 2) <br />MINE ID # OR PROSPECTING:ID nn-19Rn_9Qa <br />INSPECTION DATE -? 4g nnr 1 I/1 INSPECTOROS INITfAtS: _ -61 <br />OBSERVATIONS <br />The Division conducted a liner deployment inspection along the Phase IVC leach pad area <br />P <br />. <br />resent during the inspection was Mr, Mark'Vanoni of CC&V <br />The main purpose.of the inspection was to verify liner <br />h deployment and vacuum testing of <br />t <br />e Phase IVC lined perimeter ditch extension as outlined in the technical Revision 52 <br /> <br />The Division. had allowed CC&V to start construction of <br />h <br />' . <br />the lined ditch'exp-ans or along the <br />P <br />ase IVC pad area <br />,-,to take:advantage of the favorable weather conditions <br />for-liner <br />deployment. . <br />The technical revision was submitted on 10/30/08. This area in.the past had-several <br />drainage.enhancements added to the solution.application pipes from early'2`0-07:' ALL of the <br />past efforts to enhance.the drainage did not appear to work and in September the area had <br />another spill outside. the-.containment area. <br />Liner crew-and QA/QC-from the design engineer Mr. John <br />h Weingardt were on site observing <br />t <br />e deployment and testing sequences. Deployment and te sting of welded _'area <br />were in <br /> <br />accordance': with the approved specification for the site , <br />. <br />under Amendment #8..' <br />& E Contact Address F FS, <br />- F HW <br />-NAME: MR. TIM COMER i HMWIID (CH) <br /> <br /> <br />OPERATOR: CC&V <br />.,. <br />r. <br /> r SE. <br />ADDRESS P.O;BOX191 T WQCD:;(.CH) <br /> F OTHER <br /> <br />.. <br />CITY5TATE/ZIP: VICTOR ('o 80860 <br />CC 1 CE <br />I BL <br />