Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br />-Water Tanker, 2,500 Gal. $44.99 1 $44.99 $44.99 <br />Subtotals :1 $44.99 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest m ajor city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br /> <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 0.18 0.18 Total non-roadable mob/demob cost <br />Return time (hours) = 0.18 0.18 * two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost ** <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 1.86 0.36 <br />JOB TIME AND COST Total job time : <br />......................................................... ... Total job cost <br />$44.99 <br />Kiowa