Laserfiche WebLink
PROJECT IDENTIFICATION <br />Date : 12-Nov-2008 <br />User : RCO <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM ? <br />Permit or job no. M-1977-215 Site : Bulldog Mine <br />Abbreviation : none State :Colorado <br />Filename : M215-000 County : Mineral <br />Agency or organization name : DRMS <br />Permit or job action : TR-14 <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Remove culvert entry and backfill 9700 portal excavate 1 1.7 $163 <br />002 -Tram backfill material into 9700 portal loader 1 8.0 $417 <br />003 -Recontour slope at backfilled 9700 portal excavate 1 0.6 $65 <br />004 -Smooth grade recontoured surface around 9700 portal loader 1 3.2 $167 <br />005 -Revegetate disturbed soils at 9700 portal revege 1 2.0 $143 <br />006 -Haul reclamation equipment to and from site mobilize 1 6.4 $1,289 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 22.0 $2,244 <br />includes inflation factor adjustment of : NA % TOTAL DIRECT COST * =2,244 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Liability insurance : 2.02 % of direct total = $45 <br />Performance bond : 1.05 % of direct total = $24 <br />Job superintendent : NA* NA NA total = NA <br />Profit : 10.00 % of direct total = $224 <br />. not required (or eqp. operator serves as super.) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - <br />Financial warranty processing (legal/related costs) <br />Engineering work and/or contract/bid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />contingencies accounted for at task level <br /> TOTAL O & P = $293 <br /> CONTRACT AMOUNT (direct + O & P) = $2,537 <br />0.00 total $ NA total = $0 <br />NA NA NA total = NA <br />5.00 % of cntr. NA total = $127 <br />NA* NA total = NA <br /> TOTAL INDIRECT COST = $420 <br />TOTAL BOND AMOUNT (direct + indirect) _ $2,664 <br />