My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-12_REVISION - M1977215
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2008-11-12_REVISION - M1977215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2020 2:02:09 PM
Creation date
11/17/2008 11:32:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
11/12/2008
Doc Name
Approval letter & bond reclamation
From
DRMS
To
Emerald Mining and Leasing, LLC
Type & Sequence
TR14
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $1.15 NA NA NA NA NA NA NA NA NA NA <br />Economic life - Loader and ROPS : $1.15 NA NA $1.61 $1.25 $1.31 $0.89 NA NA NA NA <br />- Attachment No. 2: NA NA NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $2.89 $1.28 $1.38 NA NA NA NA NA NA NA NA <br />Double shifts : $2.17 $0.64 $0.69 NA NA NA NA NA NA NA NA <br />Triple shifts : $1.93 $0.43 $0.46 NA NA NA NA NA NA NA NA <br />Mechanic Labor - Loader and ROPS : NA NA NA $1.26 NA $1.02 NA NA NA NA NA <br />Attachment No. 2 : NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/lube - Loader : NA NA NA NA NA NA NA $737 $0.93 $0.81 $0.07 <br />Attachment No. 2:1 NA NA NA NA NA NA NA $0.00 $0.00 $0.00 $0.00 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Loader, BOPS and Attachments : Loader and ROPS : <br />Single shifts : $2.89 $1.28 $1.38 $1.26 $1.25 $1.02 $0.89 $7.37 $0.93 $0.81 $0.07 <br />Double shifts : $2.17 $0.64 $0.69 Attachment no. 2 : <br />Triple shifts : $1.93 $0.43 $0.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 765% 6.20% 9.80% ($/hr) Shift Differential Colorado labor lone : 2 <br />Loader operator (<=6cy) $20.67 $722 $1.58 $1.28 $2.03 $32.78 Day : $0.00 Two shift per day average : $0.15 <br />Loader operator (> 6cy) $20.82 $7.22 $1.59 $1.29 $2.04 $32.96 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $20.97 $722 $1.60 $1.30 $2.06 $33.15 Night: $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $5.55 $13.60 $0.00 $32.78 $51.93 <br />Double shifts : $3.50 $13.60 $0.00 $32.93 $50.02 <br />Triple shifts : $2.81 $13.60 $0.00 $33.03 $49.44 <br /> <br />EQUIPMENT PERFORMANCE DATA Machine Machine Machine Machine <br /> Horsepower length width height weight <br />Machine description Transmission type Fuel type (fhp) (ft) (ft) (ft) (UST) <br />CAT 246 (2004) NA Diesel 74.0 11.75 5.67 6.83 3.58 <br /> Minimum Struck Heaped Maximum Basic <br /> turning capacity capacity loading cycle time <br /> Bucket type circle (ft.) (cy) (cy) height (ft.) (min.) <br />Loader bucket : GP with bolt-on teeth 14.17 0.38 0.53 7.67 0.425 <br /> Ground speeds (fpm) at rated engine RPM <br /> Transmission gear : 1st 2nd 3rd 4th <br /> forward : 660 NA NA NA <br /> reverse : 607 NA NA NA
The URL can be used to link to this page
Your browser does not support the video tag.