Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : DRMS <br />Task # : 006 State : Colorado Permit/job #:M-1977-215 <br />Date : 1111212008 County :Mineral Abbreviation :none <br />User : RCO Site : Bulldog Mine Filename : M215-006 <br />Permit or other job action : Tr-14 <br />Task description : Haul reclamation equipment to and from site site <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51 + Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour: , $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat 320C 21.71 $26.76 $88.67 1 $115.43 $88.67 $0.00 <br />-Reveg equipmt 7.00 $10.00 $88.67 1 $98.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $214.10 $177.34 $0.00