• 0 <br /> • this citation was a formal Dust Suppression Plan approved by the Colorado Air Pollution <br /> Control Division (APCD) on October 30, 1986 and the MLRB on March 25, 1987. Among <br /> other control technologies, Climax agreed to initiate a program to cap the tailings dams and <br /> exposed beach areas on Mayflower and Robinson tailings impoundments. A dust suppressant <br /> would continue in use on the active Ten Mile tailings impoundment. Capping activities began on <br /> No. 5 dam in 1989-1990 and the beach areas of the Mayflower impoundment shortly thereafter. <br /> Readily available capping material was in short supply for the Mayflower site. Following <br /> geological and geotechnical investigations, an adequate supply of capping material was located <br /> directly adjacent to the Mayflower impoundment along the southeast edge. This material was <br /> quarried from a 14.70 acre adjacent site and directly applied to the face of No.5 dam and to the <br /> Mayflower beach areas to eliminate blowing dust. <br /> 1.3 Storke Complex Return Water Pipeline Systems <br /> The underground mining complex at Climax ceased production in 1987 and was closed entirely <br /> and allowed to flood in the early 1990s. Consequently, the facilities comprising the Storke level <br /> complex on the south side of Fremont Pass no longer were needed and were closed, <br /> decommissioned, demolished, and reclaimed as mandated by the approved reclamation plan as <br /> amended. <br /> Closure, however, did not terminate Climax responsibility for managing water draining from the <br /> closed underground operation. These waters were collected at the Storke pump station and in <br /> No. 5 shaft, the remaining structure at the Storke complex, and pumped back into the primary <br /> water collection and treatment system north of Fremont Pass at Climax. <br /> In late 2000, Climax reevaluated the Storke complex water return systems and detemined that <br /> consolidation of all drainage waters at one point was more efficient and effective for future water <br /> management. Additionally,the water return system from the No. 5 shaft is somewhat antiquated <br /> and requires upgrading and realignment. <br /> 2.0 RATIONALE AND SCOPE FOR TECHNICAL REVISION/AFFECTED LAND <br /> EXCHANGE <br /> On September 26, 2000, Mr. Allen Sorenson, DMG Reclamation Specialist, conducted an <br /> inspection of surety reduction sites proposed by Climax. During this inspection, it was noted <br /> that the borrow area for the Mayflower impoundment and No. 5 dam capping material had not <br /> completely or adequately revegetated. Closer inspection of the southeastern limits of the borrow <br /> site and subsequent comparison with a map of the affected lands as defined in AM-003 revealed <br /> 4 <br />