Additional Sheet <br />2008 Annual Report <br />Pueblo East Pit <br />M-1986-015 <br />Continental Materials Corporation <br />Anniversary Date: November 12 <br />Overview of Permit Year: During the 2007/2008 operating year mining continued in Phase 1, but that phase <br />is largely mined out now. In Phase 2 much of the year was spent designing and preparing for installation of the <br />slurry wall. The slurry wall was begun in mid October and is expected to take about 75 days or so to install. <br />Preparation for mining the northeast corner outside the slurry wall was also begun. <br />Annual Report Maps: The annual report map included in this report shows the extent of disturbance on the <br />site as divided into several categories. <br />Affected Lands: The approximate acreage in each category is shown on the map. Keep in mind that <br />boundaries between categories are sometimes vague and therefore the acreages are based on where the <br />boundaries were placed. There is currently about 218 acres in some state of disturbance. The only significant <br />land in the permitted plan that has not been disturbed is in the western portion of Phase 2. <br />Work Anticipated in 2008/2009: As Phase 1 is basically finished with mining, most, if not all mining will shift <br />to Phase 2 in the next year. Initially, mining will occur in the northeastern corner of the phase, outside the slurry <br />wall. But once the slurry wall is installed, mining will also occur inside the slurry wall. Initially, mining inside the <br />slurry wall will probably provide a means to start pumping out the basin so future mining inside the slurry wall <br />can be done with only a limited amount of maintenance pumping. <br />Bonding: This operation is covered under a self bonding arrangement. <br />Continental Materials 2008 Annual Report M-1986-015 Pueblo East Pit Page 1 of 1