Laserfiche WebLink
-4- <br />12. Primary future (Post-minine) land use (check one): <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) X Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />_ Solid Waste Disposal(WD) <br />13. Primary present land use (check one): <br />Cropland(CR) X Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />_ Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />-_ IndustriaUCommercial(IC) <br />14. Method ofMinine: Briefly explain mining method (e.g. truck/shovel): Front end loaders, dozers, <br />backhoes, dump trucks, and conveyor belts <br />15. On Site Processine: X Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): Front end loaders, dozers, backhoes, <br />dump trucks, and conveyor belts <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Proposing to go from a 9.93 acre pit to a 34.13 acre pit for additional <br />gravel requirements for Rio Blanco County road maintenance.