Laserfiche WebLink
Daily consumption of water will utilize the land owner's water rights and it is anticipated <br />that the material will be moist when excavated, approximately 20% moisture content. No <br />additional water for the pit is anticipated. Dust control for the haul road is estimated at <br />3000 gallons of water or approximately 1 load of water in a typical water truck. Water <br />will be obtained from the generated pond, utilizing the land owner's water rights. <br />Existing water rights will be utilized on as as-needed basis, as the land owner has agreed <br />to convey water rights, along with the lease for the permitted area. <br />No refuse, acid or toxic producing material is anticipated. <br />There are no incidental products to be mined or extracted.