<br />E
<br />•
<br />
<br />er{
<br />Cif. ':r''
<br />::!r •r. ,.5+, lr':rs:.
<br />oaf%'`• :.1'. i?%':: ;::?::
<br />Ji!.':';:% .Yr.:..,.x... ..I •S.: ,r7.::.,, r.,r,.i,; `ir: .+..fb;;,y, 4;1''iir3i/:•:ij%7',:%,'?'
<br />• .,,m-.. u .^:..r.• ..... _.....,,.y.. n axri . , ,. .. ,,, .. _.... .. .: : _., .....! OWN ,y .:,re[., ,;y„
<br />..._rf•? I,rta. '?rlT;vl
<br />'L:?,.;';:• irr'd:ry'!?:I . {;•rYr;[Fr
<br />:! :
<br />..._. J:r_:.:'. ... ... .:.?.., •71a .;..
<br />.... ... :..-. _.. :mss. .:
<br /> amendments shall be added, if required in the
<br /> Reclamation Plan.
<br />Subsoil 109. Minimize footprint of stockpile to limit disturbance. Use FS
<br /> for regrading and contouring.
<br />Erosion & 110. Erosion will be minimized through interim reclamation BMP
<br />Sediment Control including, but not limited to, contouring, seeding and
<br /> mulching.
<br /> 111. Sediment control measures such as, but not limited to, silt BMP
<br /> fence, straw mulch, site containment and sediment control
<br /> ponds will be utilized as needed.
<br /> 112. Construction on steep slopes (>60%) would be fully Forest Plan
<br /> designed and engineered according to Forest Service
<br /> standards and design criteria and should include an
<br /> erosion control and maintenance plan.
<br />Geologic Hazard 113. Leases contain stipulations restricting surface occupancy Federal Coal
<br /> in areas of geologic hazards: Avoid areas with high Lease
<br /> geologic hazards to prevent mass slope failure in Section Stipulation
<br /> 32, T13S, R90W, 6th P.M. unless specifically approved
<br /> by authorized officer.
<br /> 114. Controlled Surface Occupancy Stipulation. Antes with Federal Coal
<br /> moderate geological hazards will require analysis and Lease
<br /> mitigation plans detailing construction and mitigation Stipulation
<br /> techniques to ensure stability of facilities in portions of
<br /> Sections 27-29 and 32-34, TI 3S, R90W, 6th P.M. and
<br /> Sections 3-4,9-10, T14S, R90W, 6th P.M. unless
<br /> specifically approved by authorized officer.
<br /> I IS. No Surface Occupancy Stipulation- No operating on Federal Coal
<br /> slopes greater than or equal to 600/a or areas surrounded Lease
<br /> by slopes greater than or equal to 60% to prevent erosion, Stipulation
<br /> mass failure and loss of productivity in portions of
<br /> Sections 27-29 and 32-34, T13S, R90W, 6th P.M. and
<br /> Sections 3-4, 9-10 T14S, R90W, 6th P.M. unless
<br /> specifically approved by authorized officer.
<br /> 116. Controlled Surface Use Stipulation Surface use on slopes Federal Coal
<br /> 40-60% will be subject to analysis and mitigation plans Lease
<br /> detailing construction and mitigation techniques to Stipulation
<br /> minimize potential for soil loss, mass land movement,
<br /> revegetation failure and unacceptable visual impairment
<br /> except as otherwise approved by authorized officer. This
<br /> may apply to lands in portions of Sections 27-29, 32-34
<br /> T13S, R90W, 6th P.M. and Sections 3-4, 9-10, T14S,
<br /> R90W, 6th P.M.
<br />Incidental Coal 117. An coal recovered incidental to project will be taken MCC Project
<br />38
|